Skip to content
UZI Contracting

Working through a Perth summer

· 1 min read · Construction Workers

Perth summers are long, dry and hot, and heat illness on site is preventable.

Start earlier

An early start shifts the heaviest work into the cooler part of the day. Where site hours and neighbours allow it, this is the single most effective change.

Water and shade

Drinking water on site, not in a ute at the far gate. Shade for breaks. Both are the client's responsibility as much as the crew's.

Break rhythm

Shorter, more frequent breaks beat one long one. Working straight through to finish early sounds efficient and is how people end up unwell.

Watch for it

Confusion, stumbling, cramping and stopping sweating are warning signs, not toughness. Anyone showing them stops working and gets cooled down.

Plan the programme around it

Where possible, schedule the hardest physical work outside January and February afternoons.

Need this done in Perth?

Tell us the job and we'll give you a straight answer on what it takes.

Need workers on site?

Tell us about the job and we'll give you a price. Free, and no obligation.

Call us

0450 704 884

Where we are

Maddington WA 6109

Open in Maps

Hours

7:00am – 5:00pm

Please contact us on our business phone number for urgent enquiries.

Call 0450 704 884 Get a quote