Skip to content
UZI Contracting

Soft strip or full demolition

· 1 min read · Demolition

"Demolition" covers everything from stripping a tenancy back to bare structure to taking a building down entirely.

Soft strip

Removing everything non-structural: fit-out, partitions, ceilings, floor coverings, joinery, fixtures. The building stays standing. This is the common one for retail and office changeovers, and for renovations.

Full demolition

The structure comes down. Different equipment, different permits, different waste streams, and services need to be formally disconnected first.

Why the distinction matters

They are priced and planned differently. Telling a contractor "we need demolition" when you mean a soft strip will get you a quote for the wrong job. Describe what you want left standing at the end — that is the clearest way to say it.

Need this done in Perth?

Tell us the job and we'll give you a straight answer on what it takes.

Need workers on site?

Tell us about the job and we'll give you a price. Free, and no obligation.

Call us

0450 704 884

Where we are

Maddington WA 6109

Open in Maps

Hours

7:00am – 5:00pm

Please contact us on our business phone number for urgent enquiries.

Call 0450 704 884 Get a quote