Skip to content
UZI Contracting

Preparing a new build for handover inspection

· 1 min read · Construction Project Cleaning

Handover inspections fail on small, visible things far more often than on big ones.

The usual misses

  • Window and door tracks still full of construction dust.
  • Stickers and protective film on glass, appliances and tapware.
  • Paint spots on hardware, switches and skirtings.
  • Silicone smears on glass and tiles.
  • Inside cupboards and drawers — frequently skipped entirely.
  • Light fittings and exhaust fans.
  • The garage, the meter box and the external surrounds.

Do a walk-through first

Walk it as if you were the inspector, in daylight, before the crew leaves. A list found while the crew is still on site is a twenty-minute fix. Found afterwards, it is another mobilisation.

Leave time

Booking the clean for the morning of the inspection leaves no room for anything to be wrong.

Need this done in Perth?

Tell us the job and we'll give you a straight answer on what it takes.

Need workers on site?

Tell us about the job and we'll give you a price. Free, and no obligation.

Call us

0450 704 884

Where we are

Maddington WA 6109

Open in Maps

Hours

7:00am – 5:00pm

Please contact us on our business phone number for urgent enquiries.

Call 0450 704 884 Get a quote