Skip to content
UZI Contracting

How many workers a site clean actually needs

· 1 min read · Construction Project Cleaning

Undersize the crew and the clean runs into the following day. Oversize it and people work around each other.

What drives the number

  • Floor area, obviously — but also how broken up it is. Twenty small rooms take longer than one open floor of the same size.
  • How much waste is still on site. Loading out is often the bigger half of the job.
  • The finish required. A rough tidy between trades and a handover clean are different jobs.
  • The deadline. If it has to be done before an inspection tomorrow, that sets the crew size.

A sensible approach

Split the work into load-out and detail clean. Load-out takes numbers; detail takes time and care. Trying to do both with the same small crew is what causes overruns.

Tell us the area, the state it is in and the deadline, and we will tell you what we would send.

Need this done in Perth?

Tell us the job and we'll give you a straight answer on what it takes.

Need workers on site?

Tell us about the job and we'll give you a price. Free, and no obligation.

Call us

0450 704 884

Where we are

Maddington WA 6109

Open in Maps

Hours

7:00am – 5:00pm

Please contact us on our business phone number for urgent enquiries.

Call 0450 704 884 Get a quote